Szerelmey support for Charity Run
A shout out to Kalpesh Intwala at Stanton Williams who ran the Virtual London Marathon in an impressive 4hrs 17 mins to raise money for Ability Bow, a gym in East London that supports people with disabilities or long-term health conditions with accessible equipment. Due to the difficult times in Covid-19, most charities are suffering and require support from everyone. Szerelmey has worked on a number of projects with Stanton Williams over the years like the Royal Opera House and Sainsbury Laboratory and have a long association with this award winning practice.
Szerelmey is pleased to support Kalpesh in this noble cause. We have sponsored him to help raise donations – please, visit his donations page here to add your own sponsorship.

More News + Media
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees
Roman Olari has been recognised as Szerelmey’s Most Efficient Operative this month for his exceptional commitment to health and safety, professionalism and consistently high standard of work.
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees



