Working at Height
Working at height is often unavoidable in the construction industry. Whether installing stone via a scaffold, surveying and restoring facades from mast climbers and abseils, or even working on and from vehicles and MEWPs, our operatives are exposed to the dangers of working at height. Falling from height is the most common cause of workplace death in the construction industry after work related illness, and dropped tools and objects are the second largest cause of fatalities in the UK workplace. It is therefore unsurprising that the Working at Height Regulations 2005 were brought in to achieve new benchmarks for working at height and increasing operative safety. As a company Szerelmey take our working at height operations very seriously. Where collective fall protection and the elimination of hazards is not possible, we aim to create a positive health and safety culture and constantly review our procedures and safety equipment.
More News + Media
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees
Roman Olari has been recognised as Szerelmey’s Most Efficient Operative this month for his exceptional commitment to health and safety, professionalism and consistently high standard of work.
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees



