Szerelmey fundraising to support Multiplex 3 Peaks Challenge
Peter McColm and Tamsin Pickeral fundraised for the amazing veteran charity joining the Multiplex team who were fundraising for two wonderful veteran charities as part of the Multiplex 3 Peaks 2024 event (The Royal British Legion and Project Recce). The two groups took on the extraordinary challenge and completed the 3 highest peaks across Scotland, England and Wales in under 24 and 36 hours. That’s 3,000m of climbing and 24 miles of walking, with Scafell Pike being climbed during the middle of the night.
Pete was banking on his years of running and crazy cycling to power him up and over these 3 peaks!! While for Tam, following knee surgery and the devastating end of running in 2023, this really was quite a challenge.
This event was fantastic way for everyone to fundraise for this incredible charity which does so much to help our war veterans.
Thanks a lot / Ceud mìle taing / Diolch yn fawr iawn – for your sponsorship and support, together we were able to raise £27,245 for the Royal British Legion and Project RECCE CIO, made it all worth it.
Multiplex’s page: Yasmin Podesta is fundraising for The Royal British Legion (justgiving.com)
Pete’s page: Peter McColm is fundraising for The Royal British Legion (justgiving.com)
Tam’s page: Tamsin Pickeral is fundraising for The Royal British Legion (justgiving.com)

More News + Media
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees
Roman Olari has been recognised as Szerelmey’s Most Efficient Operative this month for his exceptional commitment to health and safety, professionalism and consistently high standard of work.
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees



