Szerelmey apprentice won the Barry & Peggy Scholarship
We are thrilled to share the exciting news that our apprentice, Maciej Antoniuk, has been awarded the prestigious Barry & Peggy scholarship. This year CITB received a record number of high-quality nominations, making the selection process especially challenging.
This scholarship is designed to recognize outstanding apprentices in the construction industry, offering significant financial and practical support to celebrate their achievements. At Szerelmey, we are deeply committed to nurturing the next generation of talent through the 2 apprenticeship programs. Our apprentices offer practical training, mentorship, and opportunities to build long-lasting careers in the new built stonework, restoration & construction industry.
Congratulations to Maciej on this well-deserved recognition!

More News + Media
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees
Roman Olari has been recognised as Szerelmey’s Most Efficient Operative this month for his exceptional commitment to health and safety, professionalism and consistently high standard of work.
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees



