Championing Considerate Construction: Szerelmey’s Role in CCS Awarded Projects
Szerelmey is proud to have contributed to projects recognised at this year’s Considerate Constructors Scheme (CCS) National Site Awards — 100 New Bridge Street (Gold Award) and Woolgate Exchange (Bronze Award), both delivered in collaboration with Mace.
These achievements reflect not only the success of individual project teams but also a broader alignment with the principles at the heart of the CCS Code of Considerate Practice, which encourages construction sites, companies and suppliers to exceed statutory requirements in areas such as community engagement, environmental protection, workforce wellbeing, safety, and appearance.
How Szerelmey Aligns with the Considerate Constructors Scheme
Szerelmey’s approach to construction whether through restoration, new build stonework, or facade retention & Adaptive reuse is grounded in the same principles that underpin CCS mission.
Below are just a few ways our values align:
Caring About Appearance
We take pride in delivering the highest standards of craftsmanship across both heritage and contemporary buildings. Our work goes beyond functionality and design, it reflects a commitment to beauty, longevity, and the careful preservation of the building character.
Respecting the Community
Szerelmey actively engages with the communities we work in from educational careers fairs like Green Careers Day to partnering with food and health charities. These initiatives help ensure our projects provide meaningful social value beyond the site boundary.
Protecting the Environment
Our Sustainability Strategy outlines ambitious goals to be carbon neutral by 2025 and net-zero by 2035. We are achieving this by embracing low carbon materials, circular economy principles, and the adaptive reuse of existing structures, as seen in our work at Woolgate Exchange.
Valuing Our Workforce
People are central to everything we do. As a member of the Living Wage Foundation, Supply Chain Sustainability School and Lighthouse Construction Charity, we prioritise the safety, wellbeing, and development of our teams. We invest in apprenticeships, mental health support, and ongoing training across the company.
Health and Safety
Health and safety is at the core of everything we do. We operate to the highest standards, embedding robust procedures and industry best practice across all our sites.
Building for a Sustainable Future
The recognition from the CCS is the collective efforts of everyone involved in delivering projects to the highest possible standards. At Szerelmey, we see this recognition not just as milestones, but as motivation to continue driving positive change in the construction industry from reducing embodied carbon to supporting inclusive employment and community led initiatives.
We extend our congratulations to all winning teams and look forward to further collaborations that showcase what can be achieved through craftsmanship, collaboration, and responsible construction.
More News + Media
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees
Roman Olari has been recognised as Szerelmey’s Most Efficient Operative this month for his exceptional commitment to health and safety, professionalism and consistently high standard of work.
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees