Another Award!
One of our recent hard landscaping projects, Wilkins Terrace, UCL, designed by Levitt Bernstein Architects has just won a 2019 Civic Trust Award! This is a fantastic project to have been involved with and one where we undertook a complicated package of works that included the transformation of an existing service yard into a new courtyard and the construction of a new load bearing Portland facade. The quadrangle area was paved with two types of Whitbed Portland stone and included steps, seating, planters and cladding to the external lift shafts. The Civic Trust Awards celebrate the very best in architecture that promotes excellence in design, sustainability, inclusiveness and accessibility; they are Europe’s longest running architectural and built environment awards program. Well done to all of the team!
More News + Media
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees
Roman Olari has been recognised as Szerelmey’s Most Efficient Operative this month for his exceptional commitment to health and safety, professionalism and consistently high standard of work.
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees



