Stone Federation Heritage Launch
In May the Stone Federation GB launched the new Stone Heritage Group at the Royal College of Surgeons. The evening began with a drinks reception and a chance to talk with exhibitors and Stone Federation members. The presentations were opened by our very own Bernard Burns, Chairman of the Stone Heritage Group, followed by Loyd Grossman OBE, Chairman of the Heritage Alliance, as well as other prominent Stone Federation members.
The event proved a big success and emphasised the need for a collaborative and centralised presence within the heritage industry. Part of this commitment includes the launch of the Stone Heritage Register, a valuable resource for heritage industry professionals to help them identify Stone Federation members best suited for their project, whatever the size or budget. You can order a free copy of the Register from the Stone Federation now.
More News + Media
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees
Roman Olari has been recognised as Szerelmey’s Most Efficient Operative this month for his exceptional commitment to health and safety, professionalism and consistently high standard of work.
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees



