Celebrating Excellence: Szerelmey Launches Health & Safety Recognition Award
At Szerelmey, safety is at the heart of everything we do. To recognise and encourage outstanding health and safety practices, we have introduced a new Health & Safety Recognition Award for operatives who demonstrate exceptional commitment and professionalism on site.
We are delighted to announce that Taofeek has been named the first recipient of the award, receiving a £50 voucher in recognition of his excellent work ethic and commitment to safe working practices.
Michal Golabczyk, Project Manager at Szerelmey, said: “We are pleased to recognise Taofeek for his commitment to maintaining high standards of health and safety on site. This initiative is designed to encourage and reward behaviours that help create safer working environments for everyone.”
The award scheme will continue across our projects, recognising individuals who lead by example and help promote a strong culture of safety throughout the business.
Congratulations to Taofeek on this well-deserved recognition.


More News + Media
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees
Roman Olari has been recognised as Szerelmey’s Most Efficient Operative this month for his exceptional commitment to health and safety, professionalism and consistently high standard of work.
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees



