Smashing the 24 Peaks Challenge for Building Heroes
We’re proud to share that Peter McColm, Brad Dolan, and Grzegorz Wasilewski from Szerelmey recently took part in the Multiplex 24 Peaks Challenge in the Lake District—an intense endurance event climbing 27 peaks over 50km and more than 3,500m of elevation.
Pete’s fundraiser page: Link
Brad’s fundraiser page: Link
Greg’s fundraiser page: Link
Our team alongside colleagues from across the industry, completed the challenge in just under 18 hours—a phenomenal effort considering the terrain and conditions. Another group tackled the same route and finished in 33.5 hours, showing serious grit and determination.
Together, all 34 participants raised over £32,000 for Building Heroes, a fantastic charity helping military veterans and families transition into careers in construction. It’s a cause we’re proud to support, and one that aligns closely with our values as a business.
Huge thanks to Multiplex and the Veterans Committee for organising such a seamless and inspiring event. It’s not just about the peaks—we’re climbing together to create opportunity and impact.



More News + Media
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees
Roman Olari has been recognised as Szerelmey’s Most Efficient Operative this month for his exceptional commitment to health and safety, professionalism and consistently high standard of work.
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees



