Celebrating Diversity: Szerelmey Supports Pride Month
At Szerelmey, we are proud to stand with the LGBTQ+ community and celebrate Pride Month this June 2025. Diversity and inclusion are core values of our company culture, and we believe that everyone deserves to feel respected, valued, and empowered to be their authentic selves—both in the workplace and beyond.
People are at the heart of our business, and we are committed to fostering a workplace culture that is fair, respectful and inclusive for everyone. Our support for Pride is an extension of our wider commitment to social responsibility, wellbeing, and positive impact — values that sit at the core of our sustainability strategy.
We know that creating a brighter and healthier future means celebrating individuality and ensuring that everyone feels seen, heard and valued — not just during Pride Month, but all year round.
To learn more about our commitments and values, visit our sustainability page

More News + Media
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees
Roman Olari has been recognised as Szerelmey’s Most Efficient Operative this month for his exceptional commitment to health and safety, professionalism and consistently high standard of work.
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees



