Szerelmey Wins Outstanding Quality Award at Kier Group London & Thames Valley Supply Chain Awards 2025
Szerelmey is honored to receive the Outstanding Quality award at the inaugural Kier Group London & Thames Valley Supply Chain Awards 2025. This recognition reflects our dedication to exceptional craftsmanship and high standards in the construction industry.
The event celebrated excellence across 12 categories, acknowledging the contributions of various teams supporting key projects. We extend our congratulations to all the winners:
Toureen Group (Preconstruction) | Alltask Limited (Health, Safety & Wellbeing) | PCE Limited (Innovation) | Bourne Group Ltd (Sustainability) | Dowds Group (Social Value Contractor) | Szerelmey (Outstanding Quality) | Beau Radmore (Apprentice of the Year) | Hannes Albertyn (Supervisor of the Year) | Lucas UK Group (Main Contractor of the Year – Up to £500k) | RELABOND LIMITED (Main Contractor of the Year – Up to £1m) | DECOMO (Main Contractor of the Year – £1m+) | Macai Limited (Supply Chain Partner of the Year).
The evening also featured insights from Veronica Daly, Chief Procurement and Contracts Officer at King’s College London, who emphasized the importance of a reliable supply chain in delivering successful projects. Additionally, the event provided a platform to discuss upcoming preconstruction and pipeline opportunities in the region.
Representing Szerelmey at the event were Peter McColm, Managing Director, and Tamsin Pickeral, Operations Director. A huge thank you to Kier Group for hosting a fantastic evening celebrating supply chain excellence. We also extend our gratitude to our dedicated team, whose hard work and expertise have been instrumental in achieving this recognition. Congratulations to all the winners and nominees—it is truly inspiring to see such a strong supply chain community driving quality and innovation across the industry.
We are proud to have collaborated with Kier Group on the Marylebone Square project, a major mixed-use development featuring 79 apartments, retail and restaurant spaces, community facilities, and a basement public car park. The design has been widely praised, with English Heritage highlighting its positive contribution to the area’s character.
A key feature of the project is its faience-clad façade, consisting of 10,000 units with a creamy coloured glaze. Szerelmey designed, supplied, and installed the SFS backing structure, insulation, cavity trays, and fire barriers. The faience was installed using traditional handset masonry techniques in accordance with BS 8298.
Looking ahead, we are excited to continue delivering excellence in our ongoing projects, including 33-35 Piccadilly for Kier.
We remain committed to pushing the boundaries of innovation and quality in construction, and we look forward to future collaborations that set new industry benchmarks.


More News + Media
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees
Roman Olari has been recognised as Szerelmey’s Most Efficient Operative this month for his exceptional commitment to health and safety, professionalism and consistently high standard of work.
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees



