Before and After
We have recently completed the three phase of our works at Westminster Palace Gardens, where we have been cleaning and restoring the Grade II listed Victorian red brick and faience facades. The building was designed by architect Charles Pawley in 1897-99 and features an internal courtyard with seven storeys of residential apartments. The building was given a full cleaning and careful repairs made to a number of isolated faience elements, leadwork repairs, refurbishment of the windows and repairs to the brickwork.
During the course of taking our photographs of the building, our intrepid photographer, marketing team and the building manager all got stuck in the lift somewhere between the sixth and seventh floor. The lift managed to “unstick” itself in due course, but not before all of us except the building manager, had a minor panic attack!
More News + Media
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees
Roman Olari has been recognised as Szerelmey’s Most Efficient Operative this month for his exceptional commitment to health and safety, professionalism and consistently high standard of work.
Kings Gate House is a 13-storey residential development in Victoria featuring 3,000m² of Jura limestone cladding and 234 large stone columns. Szerelmey overcame significant logistical and technical challenges, including restricted access, the installation of 800kg prefabricated columns and the absence of a supporting floor slab at level 13. Innovative solutions included the use of mast climbers, off-site column assembly and a lightweight GRC-clad steel beam system to support the upper-level façade.
Szerelmey has received a PrintReleaf Lifetime Certificate after offsetting the equivalent of 247,931 sheets of paper through the reforestation of 29.75 trees





