Over the years Szerelmey has been involved in a number of projects at the museum, with the most recent work forming part of the NG200 – celebrating 200 years of the gallery. The first phase of work involved opening up the interior of the Sainsbury Wing, adjacent to the main National Gallery building. The purpose of this was to create more space and light in the reception area and to enhance the visitor experience. Stonework was removed from the existing internal columns and salvaged for reuse. Further areas of stone were removed and a new curved fascia installed in Gascoigne Blue limestone. Pietra Serena columns were installed and extensive areas of new flooring in Gascoigne Blue limestone totaling 1200 msq laid to the main reception, basement and basement link. Large format terrazzo tiling and ceramic tiling was installed to the WCs on level 1, ground floor and the basement link. During the removal of the original columns in the reception area a letter written by the late Lord Sainsbury was discovered. Lord Sainsbury funded the building of the Sainsbury wing but had vehemently disagreed with the architects over the design of the interior. In the letter he expressed his delight that that the “unnecessary columns” were being demolished. Given how much the interior space has been opened up through these latest works, one would like to believe that Lord Sainsbury would approve.

Additional works included sensitive interventions to the main Grade I listed building. These included the careful removal of soft landscaping to the front of the left side of the building to open up a new public courtyard and area, and to create a new entrance. Existing areas of stonework were removed and salvaged and the existing front façade surrounding the door and windows modified to make way for the new entrance. A new retaining wall was erected to surround the statue of James II that stands to the front of the building. Paving was laid and works carried out to existing lightwells. Two new precast benches were fabricated from some of the salvaged Portland stone and were installed in the new garden area.

Gascoigne Blue limestone flooring installation in the National Gallery Sainsbury Wing as part of NG200 refurbishment by Szerelmey.
National Gallery NG200 - Szerelmey
National Gallery NG200 - Szerelmey

Related Projects